Tinuvin® 477-DW ECO is an aqueous UV-absorber dispersion developed for water-based coatings. Based on a red shifted hydroxyphenyl-s-triazine chromophore, it is suited for coatings and substrates requiring strong UVA range wavelength protection. Its high heat stability and excellent photo-permanence provide superior UV stabilization and fulfill the requirements of high performance industrial, decorative and wood coatings.
Tinuvin 477-DW ECO 200KG Tinuvin® 477-DW ECO is an aqueous UV-absorber dispersion developed for water-based coatings. Based on a red shifted hydroxyphenyl-s-triazine chromophore, it is suited for coatings and substrates requiring strong UVA range wavelength protection. Its high heat stability and excellent photo-permanence provide superior UV stabilization and fulfill the requirements of high performance industrial, decorative and wood coatings.
- Packaging
- 200KG Plastic drums
- KG
- Order Steps
- 200
- Pallet Size
- 800
Product Attributes
| Name | Value | Unit |
|---|---|---|
|
Form |
liquid |
|
|
Density |
1.05 - 1.05 |
g/cm³ |
Industry
- Coatings
Subindustry
- Industrial Coatings
- Automotive Coatings
- Furniture & Flooring Coatings
Application
- Automotive Additives
- Furniture & Flooring Additives
- Industrial Additives
Standard Lead Time
*Valid only for products which have the status "available" and for goods sent from our central warehouse subject to availability of stock. For products with status "limited availability" you will get more detailed information about lead time after order entry.
| Country | Standard Lead Time |
|---|---|
| 4-6 working days | |
| Portugal | 9-11 working days |
| Greece | 6-22 working days |
| Austria | 2-5 working days |
| Latvia | 6-8 working days |
| Netherlands | 5-10 working days |
| Sweden | 5-8 working days |
| Ireland | 10-14 working days |
| Luxembourg | 5-10 working days |
| Poland | 4-6 working days |
| Slovakia | 5-7 working days |
| Slovenia | 5-7 working days |
| Bulgaria | 7-10 working days |
| France | 7-10 (12 to Corse) working days |
| Lithuania | 6-8 working days |
| Serbia | 5-7 working days |
| Croatia | 5-7 working days |
| Romania | 7-10 working days |
| Hungary | 5-7 working days |
| United Kingdom | 7-10 working days |
| Switzerland | 2-4 working days |
| Spain | 5-7 (20 to Canaries) working days |
| Belgium | 5-10 working days |
| Norway | 4-8 working days |
| Finland | 5-8 working days |
| Denmark | 4-5 working days |
| Italy | 4-10 working days |
| Czech | 5-7 working days |
| Israel | 21-28 working days |
| Estonia | 6-8 working days |