Rheovis® PU 1333 is designed as an efficient high-shear thickener, with minimum effect on low- and mid-shear viscosity. It can be used in multiple binder types and in a wide range of architectural formulations (e.g.flat to high gloss) and other industries. The low viscous product form enables easyhandling and incorporation even during post addition.
Rheovis PU 1333 210KG Rheovis® PU 1333 is designed as an efficient high-shear thickener, with minimum effect on low- and mid-shear viscosity. It can be used in multiple binder types and in a wide range of architectural formulations (e.g.flat to high gloss) and other industries. The low viscous product form enables easyhandling and incorporation even during post addition.
- Packaging
- 210KG Plastic drums
- KG
- Order Steps
- 210
- Pallet Size
- 840
Industry
- Coatings
- Construction & Adhesives
Standard Lead Time
*Valid only for products which have the status "available" and for goods sent from our central warehouse subject to availability of stock. For products with status "limited availability" you will get more detailed information about lead time after order entry.
| Country | Standard Lead Time |
|---|---|
| 4-6 working days | |
| Portugal | 9-11 working days |
| Greece | 6-22 working days |
| Austria | 2-5 working days |
| Latvia | 6-8 working days |
| Netherlands | 5-10 working days |
| Sweden | 5-8 working days |
| Ireland | 10-14 working days |
| Luxembourg | 5-10 working days |
| Poland | 4-6 working days |
| Slovakia | 5-7 working days |
| Slovenia | 5-7 working days |
| Bulgaria | 7-10 working days |
| France | 7-10 (12 to Corse) working days |
| Lithuania | 6-8 working days |
| Serbia | 5-7 working days |
| Croatia | 5-7 working days |
| Romania | 7-10 working days |
| Hungary | 5-7 working days |
| United Kingdom | 7-10 working days |
| Switzerland | 2-4 working days |
| Spain | 5-7 (20 to Canaries) working days |
| Belgium | 5-10 working days |
| Norway | 4-8 working days |
| Finland | 5-8 working days |
| Denmark | 4-5 working days |
| Italy | 4-10 working days |
| Czech | 5-7 working days |
| Israel | 21-28 working days |
| Estonia | 6-8 working days |