Efka® PX 4720 is a high molecular weight acrylic dispersing agent prepared with controlled free radical polymerization. It is designed to stabilize both treated and untreated silica-based matting agents in solvent-free, UV-curing coatings. Because of the strong viscosity reducing effect it is possible to reach high matting agent loading. Efka® PX 4720 is suitable for use in ultra-low gloss applications and is delivered as polymer solution in a reactive diluent.
Efka PX 4720 0,08KG Efka® PX 4720 is a high molecular weight acrylic dispersing agent prepared with controlled free radical polymerization. It is designed to stabilize both treated and untreated silica-based matting agents in solvent-free, UV-curing coatings. Because of the strong viscosity reducing effect it is possible to reach high matting agent loading. Efka® PX 4720 is suitable for use in ultra-low gloss applications and is delivered as polymer solution in a reactive diluent.
- Packaging
- 0,08KG Glass bottle
- KG
- Order Steps
- 0.08
Industry
- Coatings
- Construction & Adhesives
Standard Lead Time
*Valid only for products which have the status "available" and for goods sent from our central warehouse subject to availability of stock. For products with status "limited availability" you will get more detailed information about lead time after order entry.
| Country | Standard Lead Time |
|---|---|
| 4-6 working days | |
| Portugal | 9-11 working days |
| Greece | 6-22 working days |
| Austria | 2-5 working days |
| Latvia | 6-8 working days |
| Netherlands | 5-10 working days |
| Sweden | 5-8 working days |
| Ireland | 10-14 working days |
| Luxembourg | 5-10 working days |
| Poland | 4-6 working days |
| Slovakia | 5-7 working days |
| Slovenia | 5-7 working days |
| Bulgaria | 7-10 working days |
| France | 7-10 (12 to Corse) working days |
| Lithuania | 6-8 working days |
| Serbia | 5-7 working days |
| Croatia | 5-7 working days |
| Romania | 7-10 working days |
| Hungary | 5-7 working days |
| United Kingdom | 7-10 working days |
| Switzerland | 2-4 working days |
| Spain | 5-7 (20 to Canaries) working days |
| Belgium | 5-10 working days |
| Norway | 4-8 working days |
| Finland | 5-8 working days |
| Denmark | 4-5 working days |
| Italy | 4-10 working days |
| Czech | 5-7 working days |
| Israel | 21-28 working days |
| Estonia | 6-8 working days |